• Friday
  • July 11, 2014
  • Last updated: 3:56am
Hong Kong

Humidity 

UV 

Pollution 

Refine Your Search

Sort by

Related Keywords

Search Results

Results 1 - 10 of 42 for architectural design

Related topics matching your search

Search results

  1. News - Hong Kong - TRANSPORT

    Steel piling plan could allow work to restart on Sha Tin-Central rail link

    Posted Jun 25th 2014, 04:49am by Ada Lee

    ... the design of the To Kwa Wan station would have to be altered. At a meeting of the Legislative Council's development panel yesterday, the Development Bureau submitted a document revealing ... of the station design. Secretary for Development Paul Chan Mo-po told the meeting that after the excavation, the Antiquities and Monuments Office would study with experts the historic value ...

    http://www.scmp.com/news/hong-kong/article/1539814/steel-piling-plan-could-allow-work-restart-sha-tin-central-rail-link
  2. News - Hong Kong - TRANSPORT

    Officials grilled over true cost of third runway at Hong Kong airport

    Posted Jun 23rd 2014, 05:51pm by Ernest Kao

    ... the project could go the same way as other big infrastructure schemes, which have seen costs soar amid delays. The authority put the price at HK$136 billion in 2011, but says design changes and rising ...

    http://www.scmp.com/news/hong-kong/article/1538943/officials-grilled-over-true-cost-third-runway-hong-kong-airport
  3. News - Hong Kong - TRANSPORT

    Drivers of dirty vehicles face losing licences as new pollution-busting machines are unveiled

    Posted Jun 18th 2014, 02:54am by CHEUNG CHI-FAI

    ... standard in force when the car was new, the drivers will be told to drive their cars to designated centres for a test that will cost them HK$310. Mok said Hong Kong's roadside air pollution ...

    http://www.scmp.com/news/hong-kong/article/1535149/uv-rays-catch-polluting-vehicles
  4. News - Hong Kong - TRANSPORT

    Government told to devise new plan to protect ancient relics

    Posted May 29th 2014, 04:35pm by FANNY W. Y. FUNG

    ... Professor Ho Puay-peng, an architecture academic at the Chinese University, suggested that a launching shaft included in the project be moved 23 metres east so that works would be farther from ...

    http://www.scmp.com/news/hong-kong/article/1521154/mtr-told-rethink-plan-protect-ancient-relics
  5. News - Hong Kong - TRANSPORT

    MTR pile-driving 'may have hit 10th century relics'

    Posted Jun 11th 2014, 04:00am by Ada Lee

    ... settlement would then be installed. Tunnelling could then continue, and the area could be preserved in situ if the station's design was adjusted, he said. While the discoveries had led ...

    http://www.scmp.com/news/hong-kong/article/1529501/mtr-pile-driving-may-have-hit-relics
  6. News - Hong Kong - TRANSPORT

    New blow for MTR as relic find delays work on Sha Tin-Central link

    Posted Jun 04th 2014, 04:05am by FANNY FUNG

    ... well and a drainage system should stay for public display. This meant the MTR would need to revise the station design. "I believe the MTR is absolutely able to do the redesign," Tien ...

    http://www.scmp.com/news/hong-kong/article/1524781/new-blow-mtr-relic-find-delays-work-sha-tin-central-link
  7. News - Hong Kong - TRANSPORT

    More woe for MTR as work on South Island Line lags behind schedule

    Posted May 22nd 2014, 03:53am by Emily Tsang

    ... a western line is on the drawing board- involves new stations at Ocean Park, Wong Chuk Hang, Lei Tung and South Horizons. The new Sha Tin-Central Link may also face delays after an architectural dig ...

    http://www.scmp.com/news/hong-kong/article/1517376/more-woe-mtr-work-south-island-line-lags-behind-schedule
  8. News - Hong Kong - TRANSPORT

    MTR to offer discount schemes to help offset 3.6pc fare rise

    Posted May 27th 2014, 07:22pm by ada.lee@scmp.com

    ... for a long time, and we want to see how passengers will react to it," she said. With the "City Saver" ticket, passengers will pay HK$400 for 40 trips on a designated urban network ...

    http://www.scmp.com/news/hong-kong/article/1519954/mtr-announces-36pc-fare-increase-concessions-early-commuters
  9. News - Hong Kong - TRANSPORT

    A rough ride on train of frustration

    Posted Apr 27th 2014, 06:33am by Ada Lee

    ... railway is designed to run underground, and officials said that the village had to be razed to build tracks to park trains in Shek Kong. Because the villagers were non-indigenous people, they were ...

    http://www.scmp.com/news/hong-kong/article/1497901/rough-ride-train-frustration
  10. News - Hong Kong - TRANSPORT

    MTR vows to improve quality after long train delays

    Posted Mar 01st 2014, 03:59am by Ada Lee

    ... after the firm found that the loose wire that caused the five-hour delay on the Tseung Kwan O Line in December was the result of a support bracket not having been fixed according to its design ... it was unbelievable that the MTR had not discovered the problem on the Tseung Kwan O Line earlier. "You did not even check against the design when you inspected the work after it was completed," he ...

    http://www.scmp.com/news/hong-kong/article/1437513/mtr-vows-improve-quality-after-long-train-delays

Pages

Login

SCMP.com Account

or