-
Advertisement
HK Magazine Archive
Magazines

What Will Happen to the New Territories?

The government’s little-publicized plans for developing the northeastern New Territories are much bigger than it would have you believe—under the current plans, huge tracts of green land will be turned to concrete. Grace Tsoi takes a closer look at the many complex issues and concerns surrounding the project.

Reading Time:11 minutes
Why you can trust SCMP
What Will Happen to the New Territories?

On September 2, while secondary school students were hunger striking at Tamar, a smaller-scale but equally vociferous protest was being staged. Several hundred villagers from Kwu Tung North, Fanling North, Ping Che and Ta Kwu Ling also staked out the government offices. They chanted slogans protesting against demolition and removal—their homes are slated to be destroyed, according to the government’s plan to develop the northeastern New Territories.

The development plan is not a new one. As early as 1998, former Chief Executive Tung Chee-hwa floated the idea to develop Kwu Tung North, Fanling North, Ping Che and Ta Kwu Leng into three new development areas (NDAs). However, the plan was halted due to a slower-than-expected population expansion in 2003. Then in 2007, Donald Tsang restarted the Hong Kong 2030 Planning Vision and Strategy scheme, and the Northeastern New Territories were again slated to be developed. The three NDAs will total 787 hectares, of which 533 hectares will be built upon. The consultation was done in the dark, and the majority of the public only learnt of the development plan at the last stage of the consultation. Originally the consultation was set to conclude at the end of August, but due to staunch opposition, the government has extended the deadline until the end of September. Here, we line out the many problems and shortcomings of the government’s plans.

Mapopo Community Farm

Advertisement

Things to do in the Northern New Territories

Can It Satisfy Housing Demand?

Advertisement

The government backs up the development plan by stating that more homes will be built in the northeast New Territories—an appealing idea in the wake of rocketing house prices. Around 54,000 homes will be built, with 40 percent of the flats set aside for public housing. During her tenure as Secretary for Development, Carrie Lam said the ratio of public housing should be kept at less than 50 percent in order to avoid a repeat of the disastrous Tin Shui Wai new town in Yuen Long. “The problem with Tin Shui Wai is not that there is too much public housing. It is because of the monopolies [for example, the community is served only be The Link and Li Ka-shing’s shopping malls and there are very few independent vendors] and insufficient jobs for the working class. Even hawking is prohibited,” says Chan Kim-ching, a researcher from Local Research Community, a think-tank focusing on urban planning. On the other hand, the project’s 21,600 public housing flats, which will be made available by the year 2022, don’t even come close to satisfying the government’s target of building 15,000 public housing homes per year. We have to ask—is getting rid of all this precious green space worth it? On the private housing side, low-density homes will be built. However, it is questionable whether these flats will be affordable for the majority of the Hong Kong public—Chan worries that they will be snapped up by mainland buyers instead of satisfying local housing needs.

Advertisement
Select Voice
Choose your listening speed
Get through articles 2x faster
1.25x
250 WPM
Slow
Average
Fast
1.25x