The cycling track and arena were soaked during Friday’s rainstorm. Photo: Handout

Hong Kong Velodrome cycling track closed for checks after heavy rain pours in through roof windows opened by fire alarm

  • Contractor carrying out a detailed inspection to ensure structural safety of 250-metre wooden track
  • Superstar track cyclist Sarah Lee joined with other volunteers to scrub floors and mop up
Topic |   Hong Kong weather

TOP PICKS

The cycling track and arena were soaked during Friday’s rainstorm. Photo: Handout
READ FULL ARTICLE